Which of the following should the technician perform NEXT?

A technician is connecting a server’s secondary NIC to a separate network. The technician connects the cable to the switch but then does not see any link lights on the NIC. The technician confirms there is nothing wrong on the network or with the physical connection .

Which of the following should the technician perform NEXT?
A . Restart the server
B. Configure the network on the server
C. Enable the port on the server
D. Check the DHCP configuration

Answer: B

Latest SK0-005 Dumps Valid Version with 90 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments