Which form should you use for each configuration?

DRAG DROP –

A company has manufacturing sites that process different types of production orders using highly specialized equipment.

Released production orders have been processing for an excessive amount of time while the system tries to find a variable route that conforms to the constraints specified in the system.

The system must automatically time out if a viable solution is not found after 120 seconds.

You need to configure the automatic timeout.

Which form should you use for each configuration? To answer, drag the appropriate forms to the correct configurations. Each form may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point.

Answer: