Which consideration must be made while performing backup operations with in the Cisco UCS Manager?
Which consideration must be made while performing backup operations with in the Cisco UCS Manager?
A . Scheduled backups are not available
B . A user can perform incremental backups of a system configuration
C . Rerunning an existing backup operation overwrites the existing backup file
D . Each backup destination can have multiple backup operations
Answer: C
Latest 300-175 Dumps Valid Version with 465 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments