What is the best way to prevent a building's indoor pollutant(s)?
What is the best way to prevent a building's indoor pollutant(s)?A . Test for radonB . Monitor carbon dioxideC . Eliminate or control pollutants at the sourceD . Remove any pollutants that enter the buildingView AnswerAnswer: C Explanation: The best way to prevent a building’s indoor pollutant(s) is to eliminate...
Which permanently installed building products are addressed in the Materials and Resources Credit category calculation?
Which permanently installed building products are addressed in the Materials and Resources Credit category calculation?A . FramingB . ElevatorsC . Process equipmentD . Formwork for concreteView AnswerAnswer: A Explanation: The Materials and Resources Credit category calculation addresses the permanently installed building products that are part of the building’s structure, enclosure,...
Strategically locating functional and decorative hardscape on a project site may reduce the amount of on-site
Strategically locating functional and decorative hardscape on a project site may reduce the amount of on-siteA . waste areaB . sensitive areaC . pervious areaD . impervious areaView AnswerAnswer: D Explanation: Strategically locating functional and decorative hardscape on a project site can reduce the amount of on-site impervious area. Impervious...
Unless mitigated, resource consumption over the life of a conventional building
Unless mitigated, resource consumption over the life of a conventional buildingA . remains steadyB . gradually decreases the total emissions footprintC . incrementally increases the total emissions footprintD . fluctuates between increasing and decreasing the total emissions footprintView AnswerAnswer: C Explanation: Unless mitigated, resource consumption over the life of a...
During which stage of a project is implementation of the Integrative Process most effective in improving performance?
During which stage of a project is implementation of the Integrative Process most effective in improving performance?A . OperationB . Early de signC . ConstructionD . Construction documentView AnswerAnswer: B Explanation: The Integrative Process is most effective during the early design stage of a project. This is when key decisions...
Which of the following strategies would help achieve this goal?
An owner of newly acquired land wants to design a building that uses materials that have minimal impact on the environment. Which of the following strategies would help achieve this goal?A . Life-cycle assessmentB . Life-cycle costing C Simple paybackC . Environmental assessmentView AnswerAnswer: A Explanation: A life-cycle assessment (LCA)...
In which of the following common building applications are chlorofluorocarbons (CFCs) found?
In which of the following common building applications are chlorofluorocarbons (CFCs) found?A . Fire hydrantsB . Roof-top ventsC . Insulation agentsD . Centrifugal chillersView AnswerAnswer: D Explanation: Chlorofluorocarbons (CFCs) are a type of compound that was widely used in the 20th century in various applications, including as a refrigerant in...
An office without transit access can substantially reduce its transportation impact if
An office without transit access can substantially reduce its transportation impact ifA . ample parking spaces are providedB . the office is located at a major intersectionC . workers are able to walk from the office to basic servicesD . green power is purchased to offset projected automobile travelView AnswerAnswer:...
Which of the following negative impacts on the environment are a result of waste being transported/diverted to landfills?
Which of the following negative impacts on the environment are a result of waste being transported/diverted to landfills?A . Increased pre-consumer recycled contentB . Decreased post-consumer recycled contentC . Waste is incinerated and used to generate energyD . Solid waste produces methane and potent greenhouse gasView AnswerAnswer: C Explanation: Waste...
Which of the following strategies should the project team consider to reduce energy demand?
A project plans to build a campus of buildings. Which of the following strategies should the project team consider to reduce energy demand?A . Purchase carbon offsetsB . Design buildings to shade each otherC . Enroll in a demand response programD . Select HVAC equipment without refrigerantsView AnswerAnswer: B Explanation:...