In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardens
In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardensA . must be calculated using at least 20% from an alternative water sourceB . must be calculated using 100% potable waterC . may be included or excluded from the calculationsD . may be calculated using a standard...
What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?
What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?A . ASHRAE 55-2010B . ASHRAE 90.1-2007C . ASHRAE 90.1-2010D . ASHRAE 62.1-2010View AnswerAnswer: C Explanation: ASHRAE 90.1-2010 is the reference standard used to determine...
What are the requirements of commercial projects for long-term bicycle storage under Location and Transportation, Bicycle Facilities - Bicycle Storage and Shower Rooms?
What are the requirements of commercial projects for long-term bicycle storage under Location and Transportation, Bicycle Facilities - Bicycle Storage and Shower Rooms?A . Provide for at least 5% of all regular building occupants, with no less than four storage spaces per buildingB . Provide for at least 10% of...
What is a benefit of including the public in a charrette for a new school before the pre-design phase?
What is a benefit of including the public in a charrette for a new school before the pre-design phase?A . Neighbors can plan for future constructionB . It will help streamline the permitting processC . Potential partnerships with the community can be revealedD . The owner can determine financial strategies...
What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?
A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?A . No action is necessary as the PV system is not required to be commissionedB...
Which of the following suggestions should the LEED AP give to the project owner?
A LEED Building Design and Construction project includes an outdoor stage for theatrical performances. In pursuit of Sustainable Sites Credit, Light Pollution Reduction the engineer has specified an LED fixture to illuminate actors on the stage while limiting light pollution. Which of the following suggestions should the LEED AP give...
What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?
What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?A . OneB . TwoC . FourD . SixView AnswerAnswer: C Explanation: According to the LEED Reference Guide for Building Design and Construction1, the Integrative Process Prerequisite, Integrative Project...
To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate
To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrateA . all luminaires have full cutoff fixturesB . all luminaires have a minimum color temperature of 3500 KC . all luminaires meet acceptable fixture ratings for the project's Model Lighting Ordnance (MLO) lighting...
The Sustainable Sites Credit, Heat Island Reduction takes into account both new and three-year aged Solar Reflectance Index (SRI) values for roofing material because
The Sustainable Sites Credit, Heat Island Reduction takes into account both new and three-year aged Solar Reflectance Index (SRI) values for roofing material becauseA . SRI generally increases with ageB . SRI generally decreases with ageC . SRI generally remains the same with ageD . SRI generally does not impact...
What benefit would this strategy provide to the owner?
The project landscape architect suggests reducing the area planned for surface parking and replacing it with additional vegetated space. What benefit would this strategy provide to the owner?A . Increases the rainwater infiltration capacityB . Decreases the amount of bicycle parking that must be providedC . Increases the overall SR...