Under Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, a current facilities requirements and operations and maintenance plan must contain which information necessary to operate the building efficiently?

Under Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, a current facilities requirements and operations and maintenance plan must contain which information necessary to operate the building efficiently?A . Any changes in schedules or setpoints for different seasons, days of the week, and times of dayB . Only changes in...

May 5, 2025 No Comments READ MORE +

When a project team sustainably develops a project site, the design should

When a project team sustainably develops a project site, the design shouldA . increase water runoffB . maximize construction pollutionC . remediate sites already in declineD . replace natural water flow patternsView AnswerAnswer: C Explanation: . remediate sites already in decline When a project team sustainably develops a project site,...

May 5, 2025 No Comments READ MORE +

Which strategy should be employed to improve daylighting when designing a new building?

Which strategy should be employed to improve daylighting when designing a new building?A . Increase the building depthB . Increase the number of skylightsC . Increase the height of interior partitionsD . Decrease the number of exterior light shelvesView AnswerAnswer: B Explanation: . Increase the number of skylights Skylights are...

April 30, 2025 No Comments READ MORE +

Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?

Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?A . Basis of Design (BOD)B . Simple Box Energy Model AnalysisC . System's manualD . Integrated Project Delivery reportView AnswerAnswer: A Explanation: The Basis of Design (BOD) is the document that contains the design team’s...

April 30, 2025 No Comments READ MORE +

To achieve the maximum number of Energy and Atmosphere points, which team members must be included?

A newly constructed school has installed solar thermal systems and wind turbines on site. To achieve the maximum number of Energy and Atmosphere points, which team members must be included?A . Energy Modeler and ContractorB . Construction Manager and Energy ModelerC . Energy Modeler and Commissioning (Cx) AgentD . Commissioning...

April 28, 2025 No Comments READ MORE +

The maximum number of points for Water Efficiency Credit, Cooling Tower Water Use can be obtained by

The maximum number of points for Water Efficiency Credit, Cooling Tower Water Use can be obtained byA . utilizing a once-through system without recirculationB . limiting cooling tower make-up to 50% of a potable sourceC . conducting a one-time potable water analysis to determine acceptable non-potable sourcesD . achieving a...

April 28, 2025 No Comments READ MORE +

Selecting a high-reflectance interior paint which is compliant with South Coast Air Quality Management District (SCAQMD) Rule 1113 can help contribute towards which two credits?

Selecting a high-reflectance interior paint which is compliant with South Coast Air Quality Management District (SCAQMD) Rule 1113 can help contribute towards which two credits?A . Indoor Environmental Quality Credit, Low-Emitting Materials and Indoor Environmental Quality Credit, Interior LightingB . Indoor Environmental Quality Credit, Low-Emitting Materials and Sustainable Sites Credit,...

April 27, 2025 No Comments READ MORE +

What stage of LEED for Neighborhood Development certification listed below is eligible for points under Building Design and Construction: New Construction, Location and Transportation Credit, LEED for Neighborhood Development Location?

What stage of LEED for Neighborhood Development certification listed below is eligible for points under Building Design and Construction: New Construction, Location and Transportation Credit, LEED for Neighborhood Development Location?A . LEED v4, LEED for Neighborhood Development Conditional ApprovalB . LEED for Neighborhood Development Pilot, Stage 3 LEED for Neighborhood...

April 27, 2025 No Comments READ MORE +

A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope. The new building project needs to complete a new Phase I ESA if

A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope....

April 26, 2025 No Comments READ MORE +

Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?

Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?A . RetailB . HospitalityC . Core and Shell DevelopmentD . New ConstructionView AnswerAnswer: D Explanation: New...

April 25, 2025 No Comments READ MORE +