What type of Credential does the principal participant of a project need to earn in order to achieve one point in the innovation credit?
- A . LEED Fellow
- B . LEED Green Rater
- C . LEED Green Associate
- D . LEED Accredited Professional (AP) with a specialty appropriate for the project
An essential goal of retro commissioning, re-commissioning, or on-going commissioning for a building’s energy using systems is to
- A . reduce CFC-based refrigerants in HVAC&R base building systems
- B . produce a master list of findings related to the commissioning process
- C . execute an energy audit that meets requirements of ASHRAE Level 2
- D . identify opportunities for cost-effective reduction in energy consumption
Rainwater harvesting can be used for which of the following credits or prerequisites?
- A . Water Efficiency Credit, Water Metering
- B . Water Efficiency Credit, Indoor Water Use Reduction
- C . Water Efficiency Prerequisite, Indoor Water Use Reduction
- D . Water Efficiency Prerequisite, Building-Level Water Metering
What must the project team do in order to maximize the reduction in operational costs with regard to Sustainable Sites Credit, Site Improvement Plan?
- A . Reduce lawn areas
- B . Increase habitat diversity
- C . Increase green space for occupants
- D . Improve water quality of runoff from rainwater
A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public. According to the Rating System Selection Guidance, which rating system would be most applicable for this project?
- A . LEED Interior Design and Construction: Retail
- B . LEED Operations and Maintenance: Retail
- C . LEED Building Design and Construction: Data Centers
- D . LEED Interior Design and Construction: Commercial Interiors
Which of the following is a feature of the ENERGY STAR® Portfolio Manager?
- A . Requires input of 36 months of data
- B . Requires ISO 14001 compliance
- C . Requires calculation and input of site energy usage
- D . Requires California Title 24 compliance
What public health risk must be balanced with water efficiency and chemical usage in every water treatment program?
- A . Botulism
- B . Mold growth
- C . Iron poisoning
- D . Legionella outbreak
Which of the following parameters need to be continuously monitored for occupied spaces in order to qualify for Indoor Environmental Quality Credit, Thermal Comfort?
- A . Air temperature and humidity
- B . Air speed and radiant temperature
- C . Air temperature and energy consumption
- D . Radiant temperature and energy consumption
To fulfill the Indoor Environmental Quality Prerequisite, Green Cleaning Policy, cleaning chemicals must be handled in a manner that
- A . meets ASHRAE standards
- B . reduces transportation expenses
- C . is in accordance with ASTM-779-03
- D . limits opportunities for accidental spills and leaks
Who needs to be surveyed for an in-patient hospital project for Location and Transportation Credit, Alternative Transportation: Option 1. Transportation Survey?
- A . People visiting patients
- B . Hospital employees
- C . Patients being released
- D . Pharmaceutical representatives