The appropriate controls that should be put in place to mitigate and reduce them with the risk based approach include? (SELECT 3)
A . Accurate
B. Appropriate
C. Risk based
D. Assertive
E. Specific
Answer: A,C,E
Latest CTMA Dumps Valid Version with 160 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund