When conducting inspections the Inspector should follow which standards:

When conducting inspections the Inspector should follow which standards:A . NACE and SSPC standards in North AmericaB . ISO standards in Europe and AsiaC . Australian standards in AustraliaD . The specified standardsView AnswerAnswer: D

March 23, 2019 No Comments READ MORE +

You are a NACE Level 2 in-house inspector working in a shop. Your in-house requires you to perform a sleeve test to test for soluble salts; however the 3 rd party NACE Level 3 inspector, the owner, has a san smart meter and has achieved a very different result and has rejected the pre-cleaning.

You are a NACE Level 2 in-house inspector working in a shop. Your in-house requires you to perform a sleeve test to test for soluble salts; however the 3 rd party NACE Level 3 inspector, the owner, has a san smart meter and has achieved a very different result and...

March 23, 2019 No Comments READ MORE +

You are the NACE Inspector on a project where a stationary floating structure is being coated and you notice a self-smoothing anti-fouling coating has been specified.

You are the NACE Inspector on a project where a stationary floating structure is being coated and you notice a self-smoothing anti-fouling coating has been specified. This is not a good choice because:A . It contains biocideB . It doesn't contain biocideC . The floating structure is stationaryD . It...

March 23, 2019 No Comments READ MORE +

Differences in technique for abrasive blasting concrete versus steel require the operator to:

Differences in technique for abrasive blasting concrete versus steel require the operator to:A . Lower the blast pressureB . Move the nozzle quickerC . Increase the standoff distanceD . a), b) and c)View AnswerAnswer: D

March 22, 2019 No Comments READ MORE +

Surface preparation methods for Non-ferrous metals are:

Surface preparation methods for Non-ferrous metals are:A . The same as for Ferrous metalsB . The same for all Non-FetT0us metalsC . Specific for each type of Non-ferrous metalD . Not requiredView AnswerAnswer: C

March 21, 2019 No Comments READ MORE +

The Inspectors' goal at the Pre-Job Conference is to:

The Inspectors' goal at the Pre-Job Conference is to:A . Obtain a clear understanding of the SpecificationB . Discuss contractual requirementsC . Manage the meeting so it doesn't go off topicD . Take accurate meeting minutes for distributionView AnswerAnswer: A

March 20, 2019 No Comments READ MORE +

Centrifugal blast cleaning requires:

Centrifugal blast cleaning requires:A . A large volume of air to propel the abrasiveB . Very large nozzlesC . Well maintained blast wheelsD . The use of single use abrasivesView AnswerAnswer: C

March 20, 2019 No Comments READ MORE +

Individuals conducting Coating Surveys should:

Individuals conducting Coating Surveys should:A . Always be NACE Level 3 Certified InspectorsB . Always be NACE or SSPC Protective coating SpecialistsC . Always be experienced Specification WritersD . Always be trained and experienced Coating IndustryView AnswerAnswer: D

March 18, 2019 No Comments READ MORE +

When using a destructive Paint Inspection Gauge the NACE inspector must:

When using a destructive Paint Inspection Gauge the NACE inspector must:A . Determine the Dry Film Thickness of the coating prior to useB . Ensure the glue on the dolly is properly applied prior to useC . Consult SSPC Guide 1 prior to useD . Select the appropriate hand wheel...

March 18, 2019 No Comments READ MORE +

The primary purpose of Fireproofing coatings are to provide:

The primary purpose of Fireproofing coatings are to provide:A . fire extinguishing characteristicsB . Temporary protection for the structureC . Preferential fuel for the fireD . Explosion resistanceView AnswerAnswer: B

March 17, 2019 No Comments READ MORE +