Which of the following is an environmentally friendly technology for controlling erosion?
Which of the following is an environmentally friendly technology for controlling erosion?A . MulchingB . Laying asphaltC . Laying tarpaulin materialD . Spraying water to contain dustView AnswerAnswer: A Explanation: The correct answer is A because mulching is an environmentally friendly technology for controlling erosion, as stated in the web...
A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public. According to the Rating System Selection Guidance, which rating system would be most applicable for this project?
A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a...
Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?
What percentage of individual occupant spaces must have individual lighting controls in projects seeking Option 1. Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?A . 40%B . 50%C . 60%D . 70%View AnswerAnswer: D Explanation: For projects seeking to comply with Option 1, Lighting Control of the Indoor Environmental...
Which of the following should be used to normalize the building's energy use?
A manufacturing plant is increasing units produced and the number of employees annually. The building is documenting compliance with Energy and Atmosphere Prerequisite, Minimum Energy Performance, Case 2, Option 1. Path 2 Benchmark Against Typical Buildings Using Comparables. Which of the following should be used to normalize the building's energy...
How long should a commercial kitchen prep sink be metered to establish a baseline when pursuing the Water Efficiency Prerequisite, Indoor Water Use Reduction, Option 2?
How long should a commercial kitchen prep sink be metered to establish a baseline when pursuing the Water Efficiency Prerequisite, Indoor Water Use Reduction, Option 2?A . Six monthsB . 12 monthsC . 18 monthsD . This type of fixture should not be meteredView AnswerAnswer: B Explanation: For establishing a...
Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the Establishment Period in Water Efficiency Credit, Outdoor Water Use Reduction project teams will be able to
Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the Establishment Period in Water Efficiency Credit, Outdoor Water Use Reduction project teams will be able toA . earn Water Efficiency Credit, Water MeteringB . earn Sustainable Sites...
Rainwater harvesting can be used for which of the following credits or prerequisites?
Rainwater harvesting can be used for which of the following credits or prerequisites?A . Water Efficiency Credit, Water MeteringB . Water Efficiency Credit, Indoor Water Use ReductionC . Water Efficiency Prerequisite, Indoor Water Use ReductionD . Water Efficiency Prerequisite, Building-Level Water MeteringView AnswerAnswer: B Explanation: Rainwater harvesting is a strategy...
Buildings account for what percentage of total energy use?
Buildings account for what percentage of total energy use?A . 30%B . 40%C . 50%D . 60%View AnswerAnswer: B Explanation: Buildings account for 40% of total energy use in the U.S., according to the U.S. Environmental Protection Agency1. This is consistent with the global estimate by the International Energy Agency,...
Which strategy can the team implement to achieve this goal?
The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to equal or be greater than 5%. Which strategy can the team implement to achieve this goal?A . Install a vegetated roof systemB . Convert lawn areas to native plantsC ....
For projects not eligible for the ENERGY STAR® rating, the project team could demonstrate compliance with Energy and Atmosphere Prerequisite, Minimum Energy Efficiency Performance by
For projects not eligible for the ENERGY STARĀ® rating, the project team could demonstrate compliance with Energy and Atmosphere Prerequisite, Minimum Energy Efficiency Performance byA . conducting an energy audit that develops a commissioning plan for the building's major energy using systemB . providing a program demonstrating no or low...