Which of the following Green Infrastructure and Buildings credits could this help the project achieve?

A project builds a central plant that burns biomass products to provide space heating and hot water to the development. Which of the following Green Infrastructure and Buildings credits could this help the project achieve?A . Solar OrientationB . indoor Water Use ReductionC . District Heating and CoolingD . Infrastructure...

May 16, 2025 No Comments READ MORE +

For a 100% previously developed site, which of the following steps should the project team take during the Initial stages of planning to meet the requirements of Smart Location and Linkage Prerequisite. Imperiled Species and Ecological Communities Conservation?

For a 100% previously developed site, which of the following steps should the project team take during the Initial stages of planning to meet the requirements of Smart Location and Linkage Prerequisite. Imperiled Species and Ecological Communities Conservation?A . Take minimum precautions A 100% previously developed site meets the requirementsB...

May 13, 2025 No Comments READ MORE +

Which of the following is a minimum program requirement of LEED® Neighborhood Development?

Which of the following is a minimum program requirement of LEED® Neighborhood Development?A . Contain one habitable building and be no larger man 1,000 acres (405 Declares)B . Contain two habitable buildings and be no larger man 1,000 acres (405 Declares)C . Contain one habitable building and be no larger...

May 12, 2025 No Comments READ MORE +

What size of newly planted trees can be considered in calculating the percentage or shaded sidewalks?

For Neighborhood Pattern and Design Tree-Lined and Shaded Streetscapes Credit - Option 2 Shaded Sidewalks. What size of newly planted trees can be considered in calculating the percentage or shaded sidewalks?A . Crown diameter at time of purchaseB . Crown diameter at time of plantingC . Crown din motor five...

May 11, 2025 No Comments READ MORE +

What Is the minimum additional percentage of recycled content (by mass) that must come from pre-consumer materials?

A project team has arranged to use recycled infrastructure components. Thirty percent (30%) by mass of the new material infrastructure components contain post-consumer recycled content. Ten percent (10%) by mass of the infrastructure is on-site reuse materials. What Is the minimum additional percentage of recycled content (by mass) that must...

May 9, 2025 No Comments READ MORE +

To develop within a 100-year flood plain and still meet the requirements of Smart Location and Linkage Prerequisite. Floodplain Avoidance, the project team must comply with the National Flood Insurance Program (NFIP) and locate the project

To develop within a 100-year flood plain and still meet the requirements of Smart Location and Linkage Prerequisite. Floodplain Avoidance, the project team must comply with the National Flood Insurance Program (NFIP) and locate the projectA . near diverse uses.B . or an adjacent site.C . on a previously distributed...

May 8, 2025 No Comments READ MORE +

What LEED Prerequisite or credit will this design help achieve?

A LEEDV for Neighborhood Development registered project is planning on using air conditioning condensate tor flushing toilets in all new buildings. What LEED Prerequisite or credit will this design help achieve?A . GIB Credit Rainwater ManagementB . Credit Outdoor Water Use ReductionC . GIB Credit Wastewater ManagementD . GIB Credit...

April 30, 2025 No Comments READ MORE +

Which of the following government agencies provides this data?

The LEED for Neighborhood Development project team needs to prepare a flood map as an exhibit tor an upcoming zoning commissioning meeting. Which of the following government agencies provides this data?A . U.S. Environmental Protection Agency (EPA) or local equivalent for protects outside of the U.SB . Federal Emergency Management...

April 23, 2025 No Comments READ MORE +

What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?

A LEED for Neighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process. The protect team has secured an agreement with the transit agency to restore the rerouted service. What is the maximum number of years the service can...

April 22, 2025 No Comments READ MORE +

How many proposed bus stops can the project team Include in the application form to attempt the credit?

A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project...

April 19, 2025 No Comments READ MORE +