Which of the following resources would help the tenant meet the requirements of Energy and Atmosphere Credit, Optimize Energy Performance?

A tenant moving into an existing building will need to install new HVAC, power, lighting systems and other equipment. Which of the following resources would help the tenant meet the requirements of Energy and Atmosphere Credit, Optimize Energy Performance?A . Green Seal Standard 11B . ANSI/ASHRAE Standard 62.1-2010C . ANSI/ASHRAE/IESNA...

May 3, 2025 No Comments READ MORE +

Which of the following credits can be affected by early planning?

A project team chooses to pursue the Integrative Process Credit. Which of the following credits can be affected by early planning? (Choose One Answer only)A . Location and Transportation Credit, Access to Quality TransitB . Energy and Atmosphere Credit, Green Power and Carbon OffsetsC . Indoor Environmental Quality Credit, Indoor...

May 3, 2025 No Comments READ MORE +

If the client has purchased green power that is not Green-e certified, then the project team should

If the client has purchased green power that is not Green-e certified, then the project team shouldA . accept not earning Energy and Atmosphere Credit, Green PowerB . provide documentation as to how the green power is equivalent to Green-e certifiedC . apply for an Innovation Credit and explain the...

May 1, 2025 No Comments READ MORE +

Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?A . Commercial dishwashers and coffee makersB . Residential clothes washers and dishwashersC . Residential dishwashers and drinking fountainsD . Commercial clothes washers and coffee makersView AnswerAnswer: B Explanation: The Water Efficiency Prerequisite for Indoor Water...

May 1, 2025 No Comments READ MORE +

Which lighting control could the design team specify to meet the credit requirements for open-office workstations?

A project is pursuing Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control. Which lighting control could the design team specify to meet the credit requirements for open-office workstations?A . Standard on-off switches at each workstationB . Plug-in task light at each workstation that allow for on, off and...

April 30, 2025 No Comments READ MORE +

For the achievement of Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse, how are hazardous materials accounted for in the calculation?

For the achievement of Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse, how are hazardous materials accounted for in the calculation?A . Included in the numerator onlyB . Included in the denominator onlyC . Included in both the numerator and denominatorD . Excluded from both...

April 27, 2025 No Comments READ MORE +

Which strategies should be assessed to meet the Owner's Project Requirements goals of 45% reduction?

In the pre-design phase, a plumbing engineer identified that the low-flow fixtures which met the Owner's requirements could achieve total reductions in indoor water usage of 39%. Which strategies should be assessed to meet the Owner's Project Requirements goals of 45% reduction?A . Switching from municipally supplied potable water to...

April 25, 2025 No Comments READ MORE +

Which of the following would contribute to the Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses?

Which of the following would contribute to the Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses?A . An existing bus stop located 1/4 mi. (0.40 km) away from the LEED project's main entranceB . An existing restaurant that is 3/4 mi. (1.20 km) away from...

April 25, 2025 No Comments READ MORE +

To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, the breathing zone rates of outdoor air ventilation to all occupied spaces must be increased above the minimum rates required in ASHRAE 62.1-2010 by at least what percentage?

To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, the breathing zone rates of outdoor air ventilation to all occupied spaces must be increased above the minimum rates required in ASHRAE 62.1-2010 by at least what percentage?A . 10%B . 20%C ....

April 21, 2025 No Comments READ MORE +

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Discussing the project goals to help identify the credits and options that the team should attempt is an example ofA . documenting LEED creditsB . creating the Basis of DesignC . developing the LEED ScorecardD . implementing the Commissioning PlanView AnswerAnswer: C Explanation: The process of discussing project goals to...

April 12, 2025 No Comments READ MORE +