Which actions must be used to perform the upgrade?
A network administrator must perform a system upgrade on a Cisco MDS 9000 Series Switch. Due to the recent changes by the security team: • The AAA server is unreachable. • All TCP communication between the MDS 9000 Series Switch and AAA servers is disabled. Which actions must be used...
Refer to the exhibit.
Refer to the exhibit. Which statement about the ERSPAN configuration in this environment is true.A . Host A is the source of ERSPAN spanned traffic and host B is the traffic analyzer. B. Host B is the source of ERSPAN spanned traffic and host A is the traffic analyzer. C....
Which configuration snippet must complete the configuration?
A customer undergoes an IT security review assessment. The auditor must have read-only access to the Cisco Nexus 9000 Series Switch to perform the configuration review. The customer implements this security role for the auditor: role name audit rule 1 permit command * rule 2 - Output omitted - username...
Which two actions must be taken to meet the requirement?
A network architect must redesign a data center on OSPFv2. The network must perform fast reconvergence between directly connected switches. Which two actions must be taken to meet the requirement? (Choose two)A . Configure all links on AREA 0. B. Implement a virtual link between the switches. C. Use OSPF...
What is the destination IP address of the vPC keepalive packets that are sent by the switch?
Refer to the exhibit. A flapping link issue has been reported on the vPC keepalive link. A packet capture has been activated on the Cisco Nexus switch. What is the destination IP address of the vPC keepalive packets that are sent by the switch?A . 192.168.254.4 B. 239.255.70.83 C. 192.168.254.1...
Which two statements about the process of upgrading an EPLD on a Cisco MDS 9000 series Switch are correct? (Choose two.)
Which two statements about the process of upgrading an EPLD on a Cisco MDS 9000 series Switch are correct? (Choose two.)A . The EPLDs for all the modules on a switch must be upgraded at the same time. B. EPLD upgrades can be completed without powering down the module during...
Which configuration accomplishes this task?
An engineer is implementing traffic monitoring for a server vNIC that is configured with fabric failover enabled. The requirement is for the traffic to be sent to an analyzer, even during a failure of one of the fabric interconnects. The analyzer is connected to unconfigured Ethernet ports on both fabric...
Which two statements describe the routing table of the leaf switch?
Refer to the exhibit. Which two statements describe the routing table of the leaf switch? (Choose two.)A . The next hop 10.0.8.65 for route 10.20.1.0724 is the TEP address of a border leaf in ACI. B. The next hop 10.0.1.14 for route 172.16.99.0/24 is the TEP address of a border...
Which two statements describe the process of upgrading an EPLD on a Cisco MUS 9000 Series Switch? (Choose two)
Which two statements describe the process of upgrading an EPLD on a Cisco MUS 9000 Series Switch? (Choose two)A . EPLDs are capable to be upgraded without replacing the hardware B. The CPLDs for all the modules on a switch must be upgraded at the same time C. An upgrade...
What is a requirement for both physical hosts?
A network engineer must migrate a Cisco WSA virtual appliance from one physical host to another physical host by using VMware vMotion. What is a requirement for both physical hosts?A . The hosts must run Cisco AsyncOS 10.0 or greater. B. The hosts must have access to the same defined...