Six Sigma LSSYB Lean Six Sigma Yellow Belt Online Training
Six Sigma LSSYB Online Training
The questions for LSSYB were last updated at May 13,2025.
- Exam Code: LSSYB
- Exam Name: Lean Six Sigma Yellow Belt
- Certification Provider: Six Sigma
- Latest update: May 13,2025
The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma project and should therefore involve keeping the __________ up to date as a means of supporting the Response Plan.
- A . X-Y Diagram
- B . Shewhart Chart
- C . FMEA
- D . Customer Service Plan
To minimize waste through the application of Lean Principles we do which of the following?
- A . Organize tools and raw materials
- B . Keep the work area clean and organized
- C . Maintain a proper volume of inventory at hand
- D . All of these answers are correct
A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is known as ____________ .
- A . Kaizen
- B . Ishikawa
- C . Kanban
- D . Muda
An important factor in a viable Control Plan is to determine who, when and to what level various personnel must be _________ to maintain the improvements made to a process.
- A . Transferred
- B . Promoted
- C . Trained
- D . Dismissed
Upon completion of a project a Belt must complete the ____________________ then transfer responsibility for this to the Process Owner.
- A . Final Process Map
- B . Project Timesheet
- C . Team Briefing Paper
- D . Documentation Plan
Systems and structures are the basis for allowing people to change their behaviors permanently and are accomplished through which of the following?
- A . Documented performance objectives
- B . Defined procedures
- C . Accurate job descriptions
- D . Incentive compensation
- E . All of these answers are correct
The Control Plan is created following the finalization of the Measure Phase and can be closed when?
- A . After the project costs have been recouped
- B . When the Champion says so
- C . Never, a Control Plan must stay in place
- D . At the fiscal yearend of the business
To reduce the people or operator introduced defects into a process it is best if a Belt can design and implement a means of ________________ into the process.
- A . Measurement automation
- B . Operator alertness
- C . Full Automation
- D . Constant supervision
A Monitoring Plan put into place at the conclusion of a project will provide for adequate systems with key metric readouts indicating out-of-spec conditions.
- A . True
- B . False
When a process has proven itself to function at a Six Sigma level this means there are less than 3.4 defects per ___________ opportunities.
- A . Hundred
- B . Thousand
- C . Million
- D . Billion
I have order this questions at Exam4pdf.com for $69. and it is free here??? hahaha i think i was fooled by that site. anyway thanks for the free questionaires.