Six Sigma LSSYB Lean Six Sigma Yellow Belt Online Training
Six Sigma LSSYB Online Training
The questions for LSSYB were last updated at May 12,2025.
- Exam Code: LSSYB
- Exam Name: Lean Six Sigma Yellow Belt
- Certification Provider: Six Sigma
- Latest update: May 12,2025
A Macro Process Map may map a process showing the entire activities of a department and can likely be broken into many Micro Process Maps showing numerous processes that comprise the activities of the department.
- A . True
- B . False
SIPOC stands for Suppliers, Inputs, ___________ , Output and Customers.
- A . Production
- B . Process
- C . Products
- D . Presentation
As we begin to describe the things occurring with our process through a Process Map we begin to see some steps that are NVA which stands for ____________.
- A . Non-value add
- B . No violation allowed
- C . Non-value actions
- D . Next vehicle action
As we identify customer and supplier requirements for a SIPOC we are urged to use the RUMBA approach which stands for Reasonable, Understandable, _____________, Believable and Achievable.
- A . Manageable
- B . Massive
- C . Memorable
- D . Measurable
Inputs that may affect your process to some degree but are not critical, are difficult to quantify and are random in nature are referred to as ___________.
- A . Nuisance
- B . Noise
- C . Pests
- D . Elusive
Long-term Data represents all the variation that one can expect to experience from the output of the subject process.
- A . True
- B . False
The temperature of a liquid is being measured by a line operator.
Which is least likely to be influenced by the instrument?
- A . Recording the measurement
- B . Actual temperature of the liquid
- C . Calibration of the instrument
- D . Reading of the instrument
One of the primary benefits of your team working together to create an X-Y Diagram is that the data collected from this exercise is accurate and certain.
- A . True
- B . False
Measurement System Analysis is a procedure used to quantify variation of the method or system used for taking measurements and used to assure usable data is collected.
- A . True
- B . False
A Belt gathered the following defect data for a trouser production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:
Data: Cutting 29
Forming 43
Stitching 17
Sealing 51
- A . Sealing, Forming, Cutting, Stitching
- B . Cutting, Stitching, Sealing, Forming
- C . Stitching, Forming, Cutting, Sealing
- D . Forming, Cutting, Sealing, Stitching
I have order this questions at Exam4pdf.com for $69. and it is free here??? hahaha i think i was fooled by that site. anyway thanks for the free questionaires.