Question #1

According to the Five Dysfunctions of a Team, what is a team’s ultimate competitive advantage?

  • A . Transparency
  • B . Teamwork
  • C . Accountability

Reveal Solution Hide Solution

Correct Answer: B
Question #2

What is one example of a servant leader behavior pattern?

  • A . Understands and empathizes with others
  • B . Focuses on individual task metrics
  • C . Thinks about the day-to-day activities
  • D . Uses authority rather than persuasion when necessary

Reveal Solution Hide Solution

Correct Answer: A
Question #3

Becoming a coach requires a shift from old behaviors to new ones.

What are three examples of old behaviors?

  • A . Focusing on deadlines
  • B . Focusing on business value delivery
  • C . Asking the team for the answers
  • D . Driving toward specific outcomes
  • E . Fixing problems for the team
  • F . Facilitating team problem solving

Reveal Solution Hide Solution

Correct Answer: A, D, E
Question #4

Features lend themselves to the Lean UX process model. They include a description, benefit hypothesis

  • A . Scope and context
  • B . Content readiness
  • C . Acceptance criteria
  • D . IP outcomes

Reveal Solution Hide Solution

Correct Answer: B
Question #5

Scrum masters are effective by using scrum methods, supporting safe principles and practices and what else?

  • A . Serving as a customer proxy
  • B . Writing stories and enablers
  • C . Managing architectural runway
  • D . Delivering through agile practices

Reveal Solution Hide Solution

Correct Answer: D
Question #6

What three attributes summarize DevOps?

  • A . A shared culture
  • B . A set of technical practices
  • C . A high performing devOps team
  • D . Strong organizational structure
  • E . A mindset
  • F . Combined deployment and release

Reveal Solution Hide Solution

Correct Answer: A, B, E
Question #7

What is the basis for most team conflicts?

  • A . Lack of leadership
  • B . Ideological differences
  • C . Lack of common goals
  • D . Unexamined assumptions

Reveal Solution Hide Solution

Correct Answer: B
Question #8

An effective SAFe scrum master helps the team improve on their journey towards excellence through continuous integration, continuous development and what else?

  • A . Continuous exploration
  • B . continuous release
  • C . wip limits
  • D . state of the art build tools

Reveal Solution Hide Solution

Correct Answer: A
Question #9

An effective Safe scrum master is a team-based servant leader who helps the team do what?

  • A . manage the team’s own backlog
  • B . understand and operate within lean budgets
  • C . embrace relentless improvement through iteration retrospectives
  • D . develop better and more specialized skill sets

Reveal Solution Hide Solution

Correct Answer: C
Question #10

The business must depend on the team for what in order for the business to do any meaningful planning?

  • A . a cross-functional skill set
  • B . commitment to the plan
  • C . measurements
  • D . team capabilities

Reveal Solution Hide Solution

Correct Answer: C

Question #11

what is the statement describing Agile team continuously adapt to new circumstances and enhance the methods of value delivery

  • A . continuous integration
  • B . improvement
  • C . delivery
  • D . deployment

Reveal Solution Hide Solution

Correct Answer: B
Question #12

When does the plan-do-check-adjust cycle occur in scrum?

  • A . at the iteration review
  • B . in the daily scrum
  • C . at all formal scrum events
  • D . as part of the iteration retrospective

Reveal Solution Hide Solution

Correct Answer: C
Question #13

Who commits to the plan at the end of iteration planning?

  • A . team
  • B . scrum master
  • C . product owner
  • D . solution owner

Reveal Solution Hide Solution

Correct Answer: A
Question #14

A servant leader knows that his or her own growth comes from what?

  • A . Management support
  • B . Facilitating growth of others
  • C . Effective training
  • D . Implementing a CALMR approach to SAFe

Reveal Solution Hide Solution

Correct Answer: B
Question #15

What are two critical areas that differentiate agile from waterfall dev?

  • A . Architectural runway
  • B . Staggered integration
  • C . Face-to-face interaction
  • D . incremental delivery of value
  • E . fast feedback

Reveal Solution Hide Solution

Correct Answer: D, E
Question #16

Good coaches do not give people the answer, but instead they do what?

  • A . They hold them to their commitments
  • B . They make the decisions
  • C . They guide people to the solution
  • D . they limit the number of questions

Reveal Solution Hide Solution

Correct Answer: D
Question #17

What is one time when a scrum master participates but does not necessarily facilitate?

  • A . During team breakout sessions at PI planning
  • B . If the entire team is present during the daily stand-up
  • C . when using ad-hoc teams for inspect and adapt
  • D . when the agile release train does not require any team coordination

Reveal Solution Hide Solution

Correct Answer: C
Question #18

What is the name of the event where all team members determine how much of the team’s backlog they can commit to delivering during an upcoming iteration?

  • A . iteration planning
  • B . solution planning
  • C . solution demo
  • D . backlog refinement

Reveal Solution Hide Solution

Correct Answer: A
Question #19

What are two good scrum master facilitation practices?

  • A . create an environment of safety so that everyone feels comfortable contributing to the discussion
  • B . llow unproductive conflict to encourage open communication
  • C . allow for deep meaningful conversations even if it is outside the scope of the agenda
  • D . ensure all voices are heard
  • E . do not enforce accountability as it creates an environment of distrust

Reveal Solution Hide Solution

Correct Answer: A, D
Question #20

During PI planning, which two tasks are part of the scrum master’s role in the first team breakout?

  • A . Provide clarifications necessary to assist the team with their story estimating and sequencing
  • B . review and prioritize the team backlog as part of the preparatory work for the second team breakout
  • C . Be involved in the program backlog refinement and preparation
  • D . identify as many risks and dependencies as possible for the management review
  • E . facilitate the coordination with other teams for dependencies

Reveal Solution Hide Solution

Correct Answer: A, E

Question #21

What is the main reason why some teams never reach stage 4 in the stages of high performing teams?

  • A . because no one guides them
  • B . leadership is spontaneous
  • C . team is not structured correctly
  • D . there is too much conflict

Reveal Solution Hide Solution

Correct Answer: A
Question #22

What is the recommended duration of a SAFe iteration?

  • A . 2 weeks
  • B . 3 weeks
  • C . 4 weeks
  • D . it depends

Reveal Solution Hide Solution

Correct Answer: B
Question #23

Participating in PI planning enables teams to gain alignment and commitment around a clear set of what?

  • A . team dependencies
  • B . prioritized objectives
  • C . user stories
  • D . features and benefits

Reveal Solution Hide Solution

Correct Answer: B
Question #24

How are the 3 Whys used?

  • A . to identify a root cause of a problem
  • B . to brainstorm ideas
  • C . to coach a team through powerful questions
  • D . to define acceptance criteria for a story

Reveal Solution Hide Solution

Correct Answer: A
Question #25

There are two primary aspects of a lean-agile mindset lean thinking and what?

  • A . feature enablement
  • B . lean systems
  • C . systems engineering
  • D . embracing agility

Reveal Solution Hide Solution

Correct Answer: D
Question #26

In SAFe, who owns the decision for releasing changes into production?

  • A . product management
  • B . system architect
  • C . release train engineer
  • D . solution owner

Reveal Solution Hide Solution

Correct Answer: A
Question #27

During PI planning who owns the planning of stories into iterations?

  • A . Agile teams
  • B . product management
  • C . system architect
  • D . scrum master

Reveal Solution Hide Solution

Correct Answer: A
Question #28

Which statement is true about the phase-gate milestone model and risk reduction?

  • A . It does not mitigate risk as intended
  • B . It creates large batches of requirements
  • C . It reduces product increment values
  • D . It helps to visualize and limit WIP

Reveal Solution Hide Solution

Correct Answer: A
A

Explanation:

https://www.scaledagileframework.com/base-milestones-on-objective-evaluation-of-working-systems/

Question #29

When does the Inspect and Adapt event happen?

  • A . At the end of the System Demo
  • B . At the end of every two weeks
  • C . At the end of the second day of PI Planning
  • D . At the end of each PI

Reveal Solution Hide Solution

Correct Answer: D
D

Explanation:

https://www.scaledagileframework.com/inspect-and-adapt/

Question #30

Who reviews the top capabilities for the upcoming PI?

  • A . Project Manager
  • B . Solution Architect/Engineer
  • C . Solution Management
  • D . Project Owner

Reveal Solution Hide Solution

Correct Answer: C
C

Explanation:

https://www.scaledagileframework.com/product-and-solution-management/

Question #31

Why should team members continuously and actively engage with other teams during PI Planning?

  • A . To manage dependencies and resolve impediments
  • B . To understand how the other team is working
  • C . To foster an environment of capacity and velocity
  • D . To create a backlog of features the team can adopt

Reveal Solution Hide Solution

Correct Answer: C
C

Explanation:

https://www.scaledagileframework.com/pi-planning/

Question #32

What are two Release Train Engineer responsibilities? (Choose two.)

  • A . Facilitate PI Planning readiness and the event itself
  • B . Understand Customer needs; validate solutions
  • C . Drive relentless improvement through Inspect and Adapt
  • D . Build an effective Product Owner / Product Manager team
  • E . Manage and prioritize the flow of work to the program

Reveal Solution Hide Solution

Correct Answer: A, C
A, C

Explanation:

https://www.scaledagileframework.com/release-train-engineer-and-solution-train-engineer/

Question #33

What anti-pattern can emerge during the Scrum of Scrums?

  • A . Scrum Masters bring in risks and impediments for escalation
  • B . Scrum Masters work with the Release Train Engineer to resolve risks and impediments
  • C . Scrum Masters have a daily 15 minute meet-after with the Release Train Engineer
  • D . Scrum Masters report on the teams’ task status each day

Reveal Solution Hide Solution

Correct Answer: D
D

Explanation:

https://www.agilest.org/scaled-agile/scrum-of-scrums/

Question #34

What action should be taken on Relentless Improvement Backlog items from the Problem Solving Workshop?

  • A . Assign points or prioritization levels
  • B . Calculate for cost before continuing
  • C . Use as direct input into the PI Planning session that follows
  • D . Assign to the team best suited to solve

Reveal Solution Hide Solution

Correct Answer: C
C

Explanation:

https://www.scaledagileframework.com/inspect-and-adapt/

Question #35

According to Daniel Pink, which three factors drive motivation and lead to better performance and personal satisfaction? (Choose three.)

  • A . Reward
  • B . Mastery
  • C . Purpose
  • D . Recognition
  • E . Responsibility
  • F . Autonomy

Reveal Solution Hide Solution

Correct Answer: B, C, F
B, C, F

Explanation:

https://www.scaledagileframework.com/unlock-the-intrinsic-motivation-of-knowledge-workers/

Question #36

What are three Team Retrospective anti-patterns? (Choose three.)

  • A . When the Scrum Master decides what the Retrospective topic(s) will be and directs the team on specific improvement items to work on
  • B . When the team’s people manager comes in to observe
  • C . When only part of the team attends
  • D . When the team commits to working on 1-2 improvement items and adds them to the next Iteration Backlog
  • E . When the team reviews their interactions during the last Iteration and identifies 1-2 improvement items to work on as a team
  • F . When the team reviews their interactions during the last Iteration and identifies 1-2 improvement items for the Product Owner to work on

Reveal Solution Hide Solution

Correct Answer: A, B, C
A, B, C

Explanation:

https://www.scaledagileframework.com/iteration-retrospective/

Question #37

One of the Scrum Master’s main responsibilities is to communicate with management and outside stakeholders to help the team in what way?

  • A . Split bigger work items where necessary
  • B . Protect them from uncontrolled addition of work
  • C . Manage the Iteration Planning Backlog
  • D . Accept stories

Reveal Solution Hide Solution

Correct Answer: B
B

Explanation:

https://www.scaledagileframework.com/scrum-master/

Question #38

When developing an Agile Team’s skill set, what skill type is most typical?

  • A . E-shaped
  • B . T-shaped
  • C . M-shaped
  • D . I-shaped

Reveal Solution Hide Solution

Correct Answer: B
B

Explanation:

https://www.scaledagileframework.com/dev-team/

Question #39

what is an anti-pattern for the IP iteration?

  • A . to plan work for the IP iteration during PI planning
  • B . to allow for sufficient capacity in the program roadmap
  • C . to ensure all stories and teams’ PI plans are completed prior to the IP iteration
  • D . to minimize lost capacity when people are on vacation or holidays
  • E . to wait for the IP iteration to fix defects

Reveal Solution Hide Solution

Correct Answer: A, E
Question #40

What is the purpose of the plan-do-check-adjust cycle?

  • A . To provide regular, predictable dev cadence to produce an increment of value
  • B . To give the ART members a process tool to keep the train on the tracks
  • C . To create a continuous flow of work to support the delivery pipeline
  • D . To allow the team to perform some final backlog refinement for upcoming iteration planning

Reveal Solution Hide Solution

Correct Answer: A

Question #41

Which meeting should the Scrum Master attend (not facilitate)?

  • A . Iteration Review
  • B . Scrum of Scrums
  • C . Daily Stand-Up
  • D . PO sync

Reveal Solution Hide Solution

Correct Answer: B
Question #42

Scrum masters help remove impediments, foster an environment for high-performing team dynamics and what else?

  • A . Relentlessly improve
  • B . Continuously deliver
  • C . Form and re-form teams
  • D . Estimate stories

Reveal Solution Hide Solution

Correct Answer: A
Question #43

Each PI planning meeting evolves over time, and ending PI planning with a Retrospective will help to do what?

  • A . Fine tune the Economic Framework
  • B . Meet compliance more rapidly
  • C . Lengthen the Architectural Runway
  • D . Continuously improve

Reveal Solution Hide Solution

Correct Answer: D
Question #44

What is one truth about teams?

  • A . Development teams can manage daily interruptions
  • B . Products are more robust when individuals on teams have specific skill sets
  • C . Changes in team composition do not impact productivity
  • D . Teams are more productive than the same number of individuals

Reveal Solution Hide Solution

Correct Answer: D
Question #45

Which type of enabler does a System Architect review during a System Demo?

  • A . Enabler Capabilities
  • B . Enabler Features
  • C . Enabler stories
  • D . Enabler Portfolio Epics

Reveal Solution Hide Solution

Correct Answer: C
Question #46

Who can change the backlog during an iteration?

  • A . Agile Team
  • B . Scrum master
  • C . Release Train Engineer
  • D . Senior Management

Reveal Solution Hide Solution

Correct Answer: A
Question #47

Which statement is true about scrum?

  • A . It is a software technical practice
  • B . It is an ideal method for static design requirements
  • C . it is based on empirical process control theory
  • D . it is a Lean system Engineering technique

Reveal Solution Hide Solution

Correct Answer: D
Question #48

What are two common PI planning anti-patterns?

  • A . Too much time spent analyzing each story
  • B . Too much time spent prioritizing features
  • C . Team decides which changes need to happen and when
  • D . Part-time scrum masters do not have time to plan as part of the team
  • E . Stories are created for the PI planning iterations

Reveal Solution Hide Solution

Correct Answer: A, D
Question #49

What are the three pillars of Scrum?

  • A . Agility
  • B . Transparency
  • C . inspection
  • D . adaptation
  • E . Courage

Reveal Solution Hide Solution

Correct Answer: B, C, D
Question #50

Who is responsible for prioritizing the iteration backlog?

  • A . Dvelopment Team
  • B . Product Owner
  • C . Scrum Master
  • D . Business Manager

Reveal Solution Hide Solution

Correct Answer: B

Question #51

Achieving the goals of Release on Demand requires an understanding of how to decouple what?

  • A . The release from deployment
  • B . The Iterations Demos
  • C . The System Demos
  • D . The Project Increment

Reveal Solution Hide Solution

Correct Answer: A
A

Explanation:

https://www.scaledagileframework.com/continuous-deployment/

Question #52

What is the value of periodic resynchronization?

  • A . Products that are delivered earlier provide more value
  • B . WIP is maximized
  • C . It causes multiple events to happen serially
  • D . It limits variance to a single time interval

Reveal Solution Hide Solution

Correct Answer: D
D

Explanation:

https://www.scaledagileframework.com/apply-cadence-synchronize-with-cross-domain-planning/

Question #53

At the System Demo, each team demonstrates their own work but the system is not integrated. They say they underestimated the integration effort, but they cannot integrate every Iteration and meet the planned scope.

What should the Scrum Master suggest?

  • A . Integrate the system during the IP Iteration
  • B . Stop the Train and go back to waterfall until integration can occur
  • C . Defer integration until the train is in the sustain and improve the section of the Implementation Roadmap
  • D . Discuss removing scope with product management to allow for continuous integratio

Reveal Solution Hide Solution

Correct Answer: C
C

Explanation:

https://www.scaledagileframework.com/system-demo/

Question #54

What are the responsibilities of a Scrum Master on a train that go beyond basic team facilitation? (Choose three.)

  • A . Write an estimate features
  • B . Manage Daily Stand-up meetings
  • C . Facilitate team preparation for PI Planning
  • D . Participate in Scrum of Scrums
  • E . Facilitate preparation for the System Demo
  • F . Prioritize Program Backlog

Reveal Solution Hide Solution

Correct Answer: C, D, E
C, D, E

Explanation:

https://www.scaledagileframework.com/scrum-master/

Question #55

How do Kanban Teams implement the SAFe Lean-Agile mindset of relentless improvement?

  • A . By establishing a Kanban board to visualize the flow of work within Kanban team and aligning with the Program and the rest of the teams
  • B . By using Cumulative Flow Diagrams which objectively measure bottlenecks and variation in the flow which could be due to systemic factors
  • C . By estimating team velocity and comparing it across Iterations for continuous improvement
  • D . By creating Classes of Services and Policies to execute the work in a way that is aligned with Program and Large Solution Levels

Reveal Solution Hide Solution

Correct Answer: B
B

Explanation:

https://www.scaledagileframework.com/team-kanban/

Question #56

What is one way to improve the skills of a team member?

  • A . Get them to work only on their specialty
  • B . Discuss their weaknesses
  • C . Pair-work with other team members
  • D . Ask them to work alone on something new

Reveal Solution Hide Solution

Correct Answer: C
C

Explanation:

https://www.scaledagileframework.com/communities-of-practice/

Question #57

What are three benefits a Community of Practice offers? (Choose three.)

  • A . To drive craftsmanship
  • B . To provide a series of incremental steps forward through a shared and common framework and for implementing SAFe
  • C . To facilitate the adoption of new methods and techniques
  • D . To improve the confidence of stakeholders through a shared and common purpose
  • E . To provide routine, periodic presentations of the short- and longer-term Vision to the teams
  • F . To provide a place to acquire knowledge – WHY NOT THIS ONE

Reveal Solution Hide Solution

Correct Answer: B, C, E
B, C, E

Explanation:

https://www.scaledagileframework.com/communities-of-practice/

Question #58

Which statement describes how Kanban Teams handle velocity in SAFe during PI Planning?

  • A . They need to estimate their velocity in story points
  • B . They use throughput as an indication of their velocity
  • C . They use cycle time because it is more objective and based on actual timestamps
  • D . They participate in scoring Business Value; however, they have a different measure than velocity

Reveal Solution Hide Solution

Correct Answer: B
B

Explanation:

https://www.scaledagileframework.com/team-kanban/

Question #59

Where does a team document new practices they want to incorporate into the their collective skill set?

  • A . Inspect and Adapt workshop notes
  • B . Improvement Roadmap
  • C . PI Planning meeting post-meeting notes
  • D . Team Iteration Backlog

Reveal Solution Hide Solution

Correct Answer: A
A

Explanation:

https://www.scaledagileframework.com/iterations/

Question #60

What is an anti-pattern to motivation?

  • A . Maximizing purpose
  • B . Individualized compensation
  • C . Market disruption
  • D . Team goals

Reveal Solution Hide Solution

Correct Answer: B
B

Explanation:

https://www.scaledagileframework.com/unlock-the-intrinsic-motivation-of-knowledge-workers/

Question #61

The Development Team may need to learn or acquire new skills. Where is this list of skills found?

  • A . As part of the outcome of the PI Planning pre-meeting
  • B . In the Improvement Roadmap
  • C . As part of the outcome of the Team Retrospective
  • D . In the HR Training and Development Plan

Reveal Solution Hide Solution

Correct Answer: C
C

Explanation:

https://www.scaledagileframework.com/dev-team/

Question #62

How does a Scrum Master lead a team’s efforts in relentless improvement?

  • A . By facilitating a team meeting
  • B . By focusing on the Iteration goals
  • C . By facilitating the team retrospective
  • D . By eliminating impediments

Reveal Solution Hide Solution

Correct Answer: C
C

Explanation:

https://www.scaledagileframework.com/scrum-master/

Question #63

Which two actions enhance an Agile Release Train’s performance? (Choose two.)

  • A . Team alignment
  • B . Reporting
  • C . Collaboration
  • D . Customer success
  • E . Reduction of total costs

Reveal Solution Hide Solution

Correct Answer: A, C
A, C

Explanation:

https://www.scaledagileframework.com/agile-release-train/ (Search for team and then search for collab)

Question #64

What is a recommended story-splitting technique for Agile teams?

  • A . Validate design with stakeholders and build the functionality later
  • B . Start with the data structure and extend into the business logic and UI
  • C . Implement the ‘happy path’ first and the rest of the scenarios afterward
  • D . Implement the story UI first and build the business logic later

Reveal Solution Hide Solution

Correct Answer: C
C

Explanation:

https://www.scaledagileframework.com/story/

Question #65

The Scrum Master interacts with which level(s) of SAFe?

  • A . Portfolio Level
  • B . Program Level
  • C . Team Level
  • D . All Levels

Reveal Solution Hide Solution

Correct Answer: B
Question #66

What is the SAFe recommended optimal duration of a PI?

  • A . It can be any duration
  • B . 2 – 4 weeks
  • C . 4 – 8 weeks
  • D . 8 – 12 weeks

Reveal Solution Hide Solution

Correct Answer: D
Question #67

During Iteration Review, the team decides to carry forward three stories to the next Iteration. This is the second time during this PI that some of the team’s stories are carried over.

What are two actions the Scrum Master should take? (Choose two.)

  • A . Coach the team to honor their commitments
  • B . Take a ‘wait and see’ approach because the team assures they are still on track for the PI
  • C . Discuss the issue at the next Iteration Retrospective
  • D . See if the Product Owner is agreeable to moving the stories into the next Iteration
  • E . Perform the 5 Whys to find the root cause of all delays

Reveal Solution Hide Solution

Correct Answer: A, E
A, E

Explanation:

https://www.scaledagileframework.com/iteration-review/

Question #68

What is the first step in the Problem-Solving Workshop?

  • A . Identify the root causes of possible problems
  • B . Create a summary report for leadership and management
  • C . Agree on the problem to solve
  • D . Record all brainstorming ideas

Reveal Solution Hide Solution

Correct Answer: C
Question #69

What is the most effective way to establish built-in quality?

  • A . Run performance testing as well as the testing of other non-functional requirements every IP Iteration
  • B . Test each release more thoroughly
  • C . Perform as many types of testing within the Iteration boundaries as possible
  • D . Create more unit tests

Reveal Solution Hide Solution

Correct Answer: C
C

Explanation:

https://www.scaledagileframework.com/built-in-quality/

Question #70

An effective SAFe Agile team ensures process visibility to who?

  • A . The Release Train Engineer
  • B . Stakeholders
  • C . The Agile Release Train
  • D . Business Owners

Reveal Solution Hide Solution

Correct Answer: B