Multi-floor deployment in a building AP When, the factor that needs attention is (). (Select 3 Answers)
Multi-floor deployment in a building AP When, the factor that needs attention is (). (Select 3 Answers)
A . The material of the wall
B . Other interference signals
C . In order not to affect the beauty, AP Should be hidden in the ceiling
D . Unified planning channel
Answer: A,B,D
Latest H12-311_V3.0-ENU Dumps Valid Version with 299 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
                             Subscribe
                            
                        
                                            
                             Login                        
                    
                        0 Comments                    
                                        
                     Inline Feedbacks                    
                    View all comments