In which order should you perform the actions?
DRAG DROP A company produces custom-made bicycles that offer many different configurations. Your standard bicycle, B-0001, is made with many common components such as a frame and wheels. Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001. You create the following configuration...
Which kind of production type should you implement?
A company is looking to use Dynamics 365 Supply Chain Management. The company is in the process of redesigning and retooling an existing manufacturing plant to group similar, cellular operations to improve efficiency and minimize wasted time between operations. They want to locate raw materials close to where they are...
What should you do?
A company produces generic and name-brand paper plates in the same factory using standard costing and using the same Bill of materials and routes to produce both products. The finance and production teams want a way to view individual raw material consumption costs in the ledger. You need to add...
Which object does NOT impact the standard cost of manufactured items?
A manufacturing company is implementing Dynamics 365 Supply Chain Management. The company uses a standard costing model to value inventory. During the setup of the system, all areas that impact the standard cost of the item must be configured correctly to calculate a complete standard cost by using routing, Bill...
What should you do?
A company produces multiple products that require an installation kit that includes 50 components. The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate...
What should you do?
A manufacturer produces HDMI cables. Typically, the item is manufactured. The manufacturer will occasionally buy unbranded HDMI cables from a vendor in order to keep up with demand. The company must use the same item number whether they make or buy the item. What should you do?A . Select route...
How should you create the new product?
HOTSPOT You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints. You need to set up a new item for the car audio system. How should you create the new product? To answer, select the appropriate...
Which four actions should you perform in sequence?
DRAG DROP A company manufactures high-end speakers. Customers may choose different color finishes and front grills. You build a product configuration model to represent this speaker. You add the following attributes for the finish and grill. You need to create a constraint that defines the allowable finish and grill combinations....
Which journal types should you use?
HOTSPOT An inventory control clerk manages adjustments in inventory. Some adjustments have a cost impact. Other adjustments must be posted to a specific ledger account or must be registered in inventory. You need to configure the system. Which journal types should you use? To answer, select the appropriate options in...
Which three actions should you perform in sequence?
DRAG DROP A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs. The company has recently seen an increase in demand and purchases another resource. The company uses the same costs per resource. However, the new resource costs more to run. The company must be able...