Level I verification requires independent attestation that the requirements of the AIMR- PPS have been met on a(n) ________ basis.
Level I verification requires independent attestation that the requirements of the AIMR- PPS have been met on a(n) ________ basis.
A . international
B . attainable
C . nationwide
D . firmwide
Answer: D
Explanation:
This is a requirement under Level I verification procedures.
Latest CFA Level 1 Dumps Valid Version with 3960 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
                             Subscribe
                            
                        
                                            
                             Login                        
                    
                        0 Comments                    
                                        
                     Inline Feedbacks                    
                    View all comments
                 
	