What is the BEST way to manage a campus-wide AV system deployment?
- A . service level agreement
- B . on-site monitoring checks
- C . remote monitoring solution
- D . stand-by stock of equipment
What would be the BEST way to verify proper performance of a CAT cable fitted with a new termination?
- A . use a cable tester and run a protocol
- B . use a multimeter to test if the pins have a connection
- C . connect the cable to a reference unit to check against it
- D . connect the source and sync, then verify there is a picture
Which of the following translates the IP address of a computer in a local network to a single IP address?
- A . HTTP
- B . MAC
- C . NAT
- D . TCP
Which of these cables should be used for a balanced microphone signal?
- A . A
- B . B
- C . C
- D . D
In order to mount a projector so that it is horizontally centered with the suspended screen, the technician should look at which drawings in the plans?
- A . detail
- B . sections
- C . elevations
- D . reflected ceiling
The MAIN benefit of an inventory tracking system in an AV rental and staging business is having an accurate record of
- A . customers contact details.
- B . current resale value of assets.
- C . current state and commitments of assets.
- D . customer’s budgets and spending history.
Which section of a program report describes the probable costs of an AV project?
- A . budget
- B . needs analysis
- C . systems descriptions
- D . infrastructure requirements
Company information, statement of work, drawings, and bill of materials are presented to the customer as what set of documents?
- A . request for quote
- B . request for proposal
- C . contract documents
- D . bid packet (response)
Upon completion of hardware installation and configuration for a new deployment, the NEXT thing the AV Project Manager should have scheduled is
- A . training the client.
- B . testing and verification.
- C . invoicing and project close out.
- D . preventative maintenance schedule.