Exam4Training

 In every TTI scheduling, the scheduling priority of the control plane information is absolutely higher than that of the data plane.

 In every TTI scheduling, the scheduling priority of the control plane information is absolutely higher than that of the data plane.
A .  True
B .  False

Answer: A

Exit mobile version