How does the system derive the requirement type from the material master data? Note: There are 2 correct answers to this question.
How does the system derive the requirement type from the material master data? Note: There are 2 correct answers to this question.
A . MRP group -> requirements class -> planning strategy -> requirements type
B. MRP group -> Strategy group -> planning strategy -> requirements type
C. Strategy group -> planning strategy -> requirements class -> requirements type
D. Strategy group -> planning strategy -> requirements type
Answer: B,D
Latest C_TS4CO_2021 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
                             Subscribe
                            
                        
                                            
                             Login                        
                    
                        0 Comments                    
                                        
                     Inline Feedbacks                    
                    View all comments
                 
	