Which four actions should you perform in sequence?
DRAG DROP
You administer a Microsoft SQL Server 2012 clustered instance that has two nodes named Node 1 and Node 2. Node 1 fails and the cluster fails over to Node 2. You need to replace Node 1 and add it to the cluster.
Which four actions should you perform in sequence? (To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.) 

Answer: 
Explanation:
Reference: http://technet.microsoft.com/en-us/library/ms181075.aspx
Latest 70-462 Dumps Valid Version with 301 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
                             Subscribe
                            
                        
                                            
                             Login                        
                    
                        0 Comments                    
                                        
                     Inline Feedbacks                    
                    View all comments
                 
	