Under the same coverage requirements, for the comparison between the adoption of f-band network and the adoption of d-band network, the number of stations required is;
Under the same coverage requirements, for the comparison between the adoption of f-band network and the adoption of d-band network, the number of stations required is;
A . More
B . Less
C . Basically equivalent
D . Difficult to evaluate
Answer: B
Latest H35-560-ENU Dumps Valid Version with 273 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
                             Subscribe
                            
                        
                                            
                             Login                        
                    
                        0 Comments                    
                                        
                     Inline Feedbacks                    
                    View all comments