What is the reason for the failure?
In a NetWorker environment, a daily scheduled backup was started. However, the volume did not mount, and the backup failed.
What is the reason for the failure?
A . Volumes labeled in the required pool are appendable.
B . Protection group is not selected on the pool.
C . There are no appendable volumes that match the pool.
D . Tape volumes attached to the NetWorker server are recyclable.
Answer: C
Latest D-NWR-DY-01 Practice Questions with 715 Q&As
Updated Study Material | Instant Download | Detailed Answers and Explanations
Subscribe
Login
0 Comments